The appraisal report changed. Here's what's different.
A side-by-side look at the legacy UAD 2.6 forms and the new UAD 3.6 URAR, required on Fannie Mae and Freddie Mac loans starting November 2, 2026.

Most conventional loans switch on November 2
- Nov 2
New GSE appraisals must be 3.6
Unless the lender has a GSE exception.
- May 20, 2027
3.6 required for everyone
The temporary exception ends. 2.6 reports lose some rep and warrant relief from Mar 1.
- FHA · VA · USDA
Still on the current forms
FHA is testing 3.6 with a few lenders. No date set for everyone else.
Every date
- Sep 8, 2025 – Jan 25, 2026
Limited production
- Jan 26 – Nov 1, 2026
Broad production
2.6 or 3.6 accepted.
- Nov 2, 2026
Mandate
New GSE appraisals must be 3.6. The mandate is not changing.
- Nov 2, 2026 – Feb 28, 2027
One-time policy exception
Sellers granted the one-time policy exception may still submit 2.6.
- Mar 1 – May 19, 2027
Reduced functionality for 2.6 reports
- Collateral Underwriter returns a risk score of 999; Loan Collateral Advisor returns 99.
- No collateral rep and warrant relief on value.
- May 20, 2027
3.6 required for all new submissions
- May 20 – Jun 27, 2027
2.6 for resubmissions only
2.6 allowed only for resubmissions of reports already in UCDP.
- Jun 28, 2027
UAD 2.6 retired
Source: Fannie Mae and Freddie Mac, UAD redesign timeline and Temporary Policy Exception announcement (Sep 30, 2026).
One report replaces the form library
UAD 2.6 used a separate form for each property type and assignment. UAD 3.6 uses one dynamic report, the URAR, whose sections appear based on property type and scope of work.
- 1004
- 1073
- 1075
- 2055
- 1025
- 2090
- 1004C
- 1004D
- 1007
- 216
Showing 10 legacy forms.
| Legacy form | UAD 3.6 product |
|---|---|
| 1004 / 70 | URAR 3.6 1 Unit |
| 1073 / 465 | URAR 3.6 Condo |
| 2055 / 1075 | URAR 3.6 Exterior |
| 1004 Desktop / 70D | URAR 3.6 Desktop |
| 1025 / 72 | URAR 3.6 2-4 Unit |
| 1004C / 70B | URAR 3.6 Manufactured |
| 2090 | URAR 3.6 Co-op |
| 1004D / 442 | URAR 3.6 Appraisal Update / Completion Report |
| 1007 / 1000 | Rental analysis built into the URAR |
| 216 / 998 | Retired for GSE delivery; OIS ordered only if the investor or client requires it |
Update and completion reports must relate to a 3.6 original. A 2.6 original can't be paired with a 3.6 follow-up.
Page one, then and now
Drag the handle, use the arrow keys, or pick a side to compare the first page of each report.


Tip: focus the round handle and use the arrow keys to move it.
Explore the new report
Select a numbered pin to see what each part of the URAR does and what it replaced.

Section by section
Pick a part of the report to see how it worked in UAD 2.6 and how it works in UAD 3.6.
Report structure
Many separate forms.
One dynamic URAR whose sections appear based on property type and scope of work.
What changed: One report replaces the form library.
No example image for this section yet.
Report structure
Many separate forms.
One dynamic URAR whose sections appear based on property type and scope of work.
What changed: One report replaces the form library.
No example image for this section yet.
Summary
Conclusion at the end.
Summary of value, condition and defects on page one.
What changed: The conclusion moved from the back of the report to page one.

Photos and exhibits
Sales comparison grid
Market data
Unit interior
A single GLA line and room count.
Room-by-room level detail with kitchen and bath update status.
What changed: One line became level-by-level detail.

Energy and green features
Maybe one grid line.
A dedicated section with ratings like HERS and impact on value.
What changed: Energy and green features get their own section.

Properties analyzed but not used
No field.
A table of comps considered and rejected, with the reason.
What changed: Rejected comps are now shown with the reason. Helps prevent reconsideration-of-value requests.

Revisions
What this means for you
Choose your role. You can share this view with a link.
Map 3.6 products in your LOS and AMC platform and send one test order.
Fees and turn times are running higher during the transition.
If you sell to Fannie or Freddie and aren't ready, decide now on the one-time policy exception.
New terms
Select a card to flip it from the old term to the new one.
Quality and condition ratings (Q1–Q6, C1–C6) still apply.
Frequently asked questions
Quick answers
When does UAD 3.6 start?
It's been available since January 26, 2026, and is required for new GSE appraisals starting November 2, 2026. Lenders granted a one-time GSE exception can use 2.6 until May 19, 2027.
Will appraisals cost more?
Many appraisers are pricing in extra time on the new report during the transition. Talk to your lender or AMC about current fees.
Will appraisals take longer?
Early 3.6 assignments are running a few days longer while appraisers and software catch up.
Does this apply to FHA or VA loans?
Not yet. FHA is testing 3.6 with a few lenders, and there's no date set for everyone else. Government loans follow current agency guidance.
What happened to the 1004?
It's replaced by the URAR, which covers single-family, condo, 2–4 unit, manufactured and co-op properties in one report.
Why did this change?
To standardize appraisal data, cut free-form commentary and subjectivity, and make reports easier for people and software to read.
Key dates and the transition
What is UAD and why is it being updated?
The Uniform Appraisal Dataset (UAD) is the standardized dataset used to report appraisal property information electronically through UCDP. Fannie Mae and Freddie Mac are updating it to create a data-driven, dynamic reporting structure that captures property and market information in one structure for all property and inspection types. The update aligns with MISMO Reference Model 3.6. UAD 3.6 is mandatory for new appraisal reports submitted to UCDP on or after November 2, 2026, unless the lender has a GSE policy exception.
How will the UAD 3.6 mandate be enforced?
UAD 3.6 becomes mandatory for all new appraisal reports submitted to UCDP on or after November 2, 2026. The mandate is based on the report's initial UCDP submission date. A new UAD 2.6 report submitted on or after that date will receive a Fatal message and a Not Successful submission result. The exception: sellers granted the GSEs' one-time policy exception may still submit UAD 2.6 through February 28, 2027, with reduced functionality from March 1 through May 19, 2027. UAD 3.6 is required for all new submissions starting May 20, 2027.
Can I still submit revisions in UAD 2.6 after November 2, 2026?
Yes. Lenders may continue submitting revisions to a UAD 2.6 appraisal report if the original report was submitted to UCDP in UAD 2.6. Revisions submitted to that existing DocFile ID remain in UAD 2.6. From May 20 through June 27, 2027, UAD 2.6 is allowed only for resubmissions of reports already in UCDP, and UAD 2.6 is retired on June 28, 2027.
How do I prepare for UAD 3.6?
Lenders, AMCs, and appraisers should confirm that their systems, workflows, and partners are ready. Because the mandate follows the UCDP submission date - not the loan application or appraisal effective date - lenders should allow enough time to order, receive, and submit any UAD 2.6 reports before November 2, 2026. The GSE UAD webpages provide onboarding materials, the Lender Readiness Kit, training, and webinars.
How does a lender process a transferred loan with a UAD 2.6 appraisal after the mandate?
UCDP does not allow the receiving lender to reuse a Document File ID created from another lender's UCDP submission. The new lender may use the transferring lender's DocFile ID and Successful Submission Summary Report when delivering the loan to the GSEs in Loan Delivery or Loan Selling Advisor.
Can a pre-mandate appraisal be resubmitted under a new loan number after the mandate?
If the applicable GSE policy permits reuse of the appraisal report, the lender can change the loan number in UCDP through the Portal or Direct Integration after the mandate while using the original Document File ID.
Can a loan with a UAD 2.6 appraisal still be sold after UAD 2.6 retirement?
Yes. UAD 2.6 retirement applies to appraisal-report submission in UCDP; it does not prevent the loan from being sold to the GSEs. Standard appraisal-report expiration requirements still apply under the relevant GSE policy.
Forms, scope and agencies
Are the appraisal report forms being replaced?
Yes. The legacy residential appraisal forms are being retired and replaced by a single data-driven, flexible reporting structure. This includes the 1004/70 family, condominium, exterior-only, manufactured-home, cooperative, small residential income, rent-schedule, and appraisal update/completion forms. The redesigned URAR, Restricted Appraisal Update Report, and Completion Report share a consistent look and feel.
Are form numbers going away?
Yes. Under the new URAR, the subject property's data drives the report instead of a form type or form number. The dynamic structure and its discrete, repeatable data replace the legacy form-number approach.
How do appraisal update and completion reports work under UAD 3.6?
Restricted Appraisal Update Reports and Completion Reports are separate reports under UAD 3.6. When applicable, they must be submitted in UAD 3.6 ZIP format and associated with an existing UAD 3.6 URAR submission in UCDP. For UAD 2.6, the existing 1004D/442 process remains unchanged and uses UAD 2.6 XML. UCDP does not accept mixed UAD standards under the same DocFile ID, so the update or completion report must match the original appraisal's format.
What happens to construction loans that began before the mandate and finish later?
A construction loan tied to a subject-to-completion UAD 2.6 appraisal may be submitted to UCDP before the mandate. When construction is complete, Form 442/1004D, the Appraisal Update and/or Completion Report, or another accepted alternative must be retained in the loan file for the life of the loan.
When may the legacy Single-Family Comparable Rent Schedule (1007/1000) be used?
Usually, market rent is part of the original assignment and appears in the URAR's Rental Information section, so a separate 1007/1000 is not needed. If market rent is needed later, the original appraiser should amend the URAR. Only in rare cases when that appraiser is unavailable may another appraiser complete the legacy rent schedule, while taking the steps needed for USPAP compliance.
Can I use an Operating Income Statement (216/998)?
The GSEs do not require the Operating Income Statement. They have retired the form and do not expect to receive it through UCDP.
Does UAD 3.6 support different appraisal scopes of work?
Yes. UAD 3.6 supports traditional, hybrid, desktop, and exterior appraisal assignments. Refer to the applicable GSE Selling Guide for policy requirements.
Does the new appraisal report still have a General Addendum?
No. Instead of a General Addendum, each URAR section includes specific fields where the appraiser can add commentary as needed.
Is the new URAR for mortgage purposes only?
Yes. The URAR's purpose has not changed. Its opinions, conclusions, and certifications are for the intended user to evaluate the subject property for a mortgage finance transaction or related activities.
Does UAD 3.6 support FHA, VA, and USDA requirements?
Yes. The GSEs worked with FHA, USDA, and VA to include their specific requirements in UAD 3.6. Contact the applicable agency for its implementation plan.
How are property characteristics described and identified?
UAD 3.6 uses standardized data fields and enumerations to define the property. This helps lenders and other end users understand property characteristics, verify eligibility, and assess overall collateral risk.
Does UAD 3.6 support land-only appraisals?
No. Land-only appraisals are outside the scope of the UAD 3.6 and Forms Redesign project.
What is the UAD Compliance API?
Through appraisal software, an appraiser can use the GSE UAD Compliance APIs to evaluate XML against the UAD Delivery Specification. The rules check data completeness, validity, format, data type, and reasonableness. The API does not include Loan Collateral Advisor or Collateral Underwriter messages or findings such as eligibility, risk scores, or appraisal quality.
What ULDD requirements relate to UAD 3.6?
For lenders delivering loans to the GSEs, ULDD Phase 5 (version 5.1.0) includes enhancements that align ULDD property data points with UAD 3.6.
How can an appraiser prepare for UAD 3.6?
Appraisers can take the GSE-created training available through appraisal education providers, including options for continuing education credit. They should work with their appraisal software vendor on functionality, vendor training, and testing timelines, and review the GSE's Industry's Guide to the New URAR, reference-guide appendices, and sample scenarios.
How will an appraiser know whether an assignment uses UAD 2.6 or UAD 3.6?
The required UAD version should be stated in the Engagement Letter. If it is not, the appraiser should ask the client. During a staged lender rollout, the required version may vary by assignment and by lender.
Inside the new URAR
Have the Condition and Quality Ratings changed for UAD 3.6?
The rating scale has not changed, but the definitions were rewritten for clarity. Interior and Exterior Condition and Quality Ratings were also added so the report can distinguish meaningful differences between interior and exterior condition. See Appendix 2 of the URAR Reference Guide or the Condition and Quality Rating Definitions for details.
Do Condition and Quality Ratings apply to manufactured housing?
Yes. The ratings apply to every residential property type, including manufactured homes. This is a change from UAD 2.6.
Why are component-level Update Status and Condition Status needed?
They provide more granular data about property components and support development of a credible opinion for the overall Condition and Quality Ratings under the updated definitions.
Have Update Statuses for interior features changed?
Yes. The URAR Reference Guide's Unit Interior section explains Room Update Status for kitchens and baths, Overall Update Status for bathrooms, and Overall Update Status for flooring. New construction should be reported as Fully Updated rather than Not Updated.
What does Site Owned in Common mean?
It means the subject or comparable has an undivided interest in land that supports the dwelling and is commonly owned, typically by an association. When a site is owned in common, Total Site Size is not required. Fee simple and leasehold are not factors in determining whether the site is owned in common.
How is Year Built reported when a dwelling was built in different years?
For original construction spanning multiple years, report the year the structure was completed. For example, a home started in 2024 and completed in 2025 is reported as 2025. If an addition was constructed years later, report the year of the original structure; a 1950 home with a 2002 addition is reported as 1950.
What information is required for accessory dwelling units (ADUs)?
The URAR captures detailed ADU information including size, condition, room count, and location. ADUs are displayed more consistently than on legacy forms, making them easier for reviewers to identify. See the URAR Reference Guide for complete field requirements.
How should appraisers adjust for unit-count discrepancies in the Sales Comparison Approach?
Add an Additional Row under the Dwelling(s) subsection, label it Total Units, and show the unit count for the subject and every comparable. Make total-unit-count adjustments on that row. Make feature-level adjustments, such as differences between one- and two-bedroom units, on the matching line in the Unit(s) subsection. Avoid adjusting the same unit characteristic twice.
How should a sloped or varied ceiling be measured and labeled?
Measure ceiling height at its highest point, consistent with standard measurement practice. Choose the ceiling style that best represents the predominant overall shape using the UAD Reference Guide options. If none fits, choose Other and provide a description.

Want a UAD 3.6 walkthrough for your team?
Marketwise reviews appraisal reports in-house. We can walk your team through the new URAR.